Stoltzman Road Corridor survey is open through November 23

Published on November 13, 2026

Stoltzman Rd Survey Image

Mankato/North Mankato Area Planning Organization (MAPO), Blue Earth County, and the City of Mankato are leading the CSAH 16 (Stoltzman Road) Corridor Study. The study is assessing how Stoltzman Road is working for all users and what could be done to improve the corridor for everyone. 

An important part of the process is to hear from you. An open house was held in early November where three alternatives were presented. Links to those alternatives are below.

Existing 5-Lane Alternative

3-Lane Signal Alternative

3-Lane Roundabout

Learn more about the study and share your feedback by taking the survey at the link below. The survey is open through November 23.

Survey

 

Tagged as: